Sunday, August 3, 2008

A possibility that it may be full of the human waste of the biotoilet Mountaineer assumption super-え



In the biotoilet which the Ministry of Environment worked formally from opening of the climbing season (July 1) this year, the concern with which human waste overflows has come out to the mountain trail in Mt. Fuji Yamanashi. Attentions gathered in the measure which aims at world heritage registration, and the mountaineer of the season far exceeded the assumption number of the time of installation now. The toilet which considered environment has lapsed into the pinch in Mt. Fuji where environmental problems, such as illegal disposal of garbage, are world heritage registration with a neck.
According to prefecture-in-question Fuji Yoshida-shi, the number of mountaineers in July is a total of 99,000 about persons. It increased by about 35,000 persons by the corresponding-period-of-last-year ratio. About 11,000 persons visited on July 19 used as 3 consecutive-holidays first day, and it has exceeded 10,000 people for the first time in 27 years since 1981 which began to take statistics.
The toilet in question is located in the seventh stage of the Yoshidaguchi mountain trail. In connection with a mountaineer's leap, the situation far exceeding 1000 assumption users on the first continues, and the Ministry of Environment says, "It is over the limit of assumption throughput." Since the Bon Festival rest which mountain-climbing visitor of large number of people visits has drawn near every year, the city which has managed is also strengthening watch, saying "ハラハラ is carried out every day (doesn't human waste overflow?)."
There are four public lavatories of the Yoshidaguchi mountain trail in all from the fifth stage to the summit of the mountain. For this reason, the Ministry of Environment installs the signboard which appeals to use distributing other toilets in the sixth stage or a hut, and is appealing for cooperation to the mountaineer. [Noboru Tagami]
▽ biotoilet Toilet new type replaced with a dipping-up type, flush, etc. Human waste is disassembled into water and an organic matter by through and a microbe at the processing layer which put in sawdust, the ground, etc. スギチップ is used for a processing layer in the seventh stage of Mt. Fuji. The organic matter after decomposition is emitted as gas, and is carrying out circulation use of the moisture at the water for a flush. Incineration processing of the human waste was carried out before 97 years of installation.
biotoilet Mountaineer assumption super-え ">A possibility that it may be full of the human waste of the biotoilet Mountaineer assumption super-え

No comments: